the journey

timeline

Building the Bodega Bungalow was a labor of love that ultimately took us more than 4 years to complete.

When we embarked on our journey, we had no idea what we were getting into. Hopefully, our FAQ page can help others avoid some of the obstacles we encountered, saving time and money along the way.

site work

April - October 2019.

We broke ground in April, beginning with electrical trenching to the site. Riverwood Construction handled the site work and the site-built living room connector. The geotechnical report required significant excavation and a poured concrete foundation that topped out at nearly 5 feet.

module fabrication

June - October 2019.

The modules were fabricated in Oregon by Elavate Modular. Fabrication began in June 2019, and continued up through the time it was time for them to depart in October.

module set day

October 2019.

The modules spent 2 days traveling more than 600 miles from Oregon. The set took less than 6 hours.

site construction

October 2019 - January 2020.

A site-built living room connects the two prefabricated modules, and was completed by Riverwood Construction. Furniture arrived in early February.